QMS for medical devices

    Replacing Greenlight Guru – with Power IMS in Microsoft Teams

    Greenlight Guru publicly describes itself as a QMS platform for medical device makers: documents, changes and training, design controls with traceability, risks, quality events/CAPA and clinical data.

    7 comparison points

    5 of 7 points covered

    4 Power IMS module mappings1 Via Microsoft 3652 Assess individually

    7 editorial comparison points; not a measurement of complete feature parity. 7 vendor claims not yet verified in detail.

    Mapped Power IMS capabilities

    • Document control & versioning

      Document control with status, metadata, versions and approval workflow in Teams; stored in your tenant's SharePoint.

    • Risks & opportunities

      Risk register with assessment and actions in Power Risk; risks/opportunities per process in Power QMS.

    • Nonconformities, CAPA & complaints

      Findings, deviations and corrective actions from audits in Power Audit; improvement actions and complaint handling via Power CI with assessment and implementation tracking.

    • Training & read receipts

      Read receipts in Power QMS; training, competencies and acknowledgement matrix in Power Knowledge.

    • Permissions, search & notifications

      Uses Entra ID, SharePoint permissions, Microsoft Search and Teams notifications – no separate user management.

    Capability comparison: Greenlight Guru and Power IMS

    AreaGreenlight Guru (per vendor)Power IMS as replacement
    Document control & versioning

    Documents, changes and training with routing and audit trail.

    Not yet verified in detail – no claim that features are absent

    Matching module

    Document control with status, metadata, versions and approval workflow in Teams; stored in your tenant's SharePoint.

    Power QMSPower QMS for Teams
    Design controls

    Design controls and traceability for medical devices.

    Not yet verified in detail – no claim that features are absent

    Individual review

    No design controls for medical devices; assess individually.

    Risks & opportunities

    Product risks, AI suggestions for risks.

    Not yet verified in detail – no claim that features are absent

    Matching module

    Risk register with assessment and actions in Power Risk; risks/opportunities per process in Power QMS.

    Power RiskPower Risk
    Nonconformities, CAPA & complaints

    Quality events linked to CAPA and training.

    Not yet verified in detail – no claim that features are absent

    Matching module

    Findings, deviations and corrective actions from audits in Power Audit; improvement actions and complaint handling via Power CI with assessment and implementation tracking.

    Scope / open: CAPA and complaints are confirmed via Power Audit and Power CI; identical root cause analysis, escalation and effectiveness verification need workflow-level verification.

    Power AuditPower AuditPower CIPower CI
    Training & read receipts

    Training follows document changes; AI query analytics.

    Not yet verified in detail – no claim that features are absent

    Matching module

    Read receipts in Power QMS; training, competencies and acknowledgement matrix in Power Knowledge.

    Power KnowledgePower Knowledge
    Regulated industries & e-signatures

    Aligned with medical devices (ISO 13485, FDA).

    Not yet verified in detail – no claim that features are absent

    Individual review

    No FDA 21 CFR Part 11 / EU GMP Annex 11 validation claimed – assess individually for GxP and medical-device requirements.

    Permissions, search & notifications

    The application's own user, permission and notification management.

    Not yet verified in detail – no claim that features are absent

    Via Microsoft 365

    Uses Entra ID, SharePoint permissions, Microsoft Search and Teams notifications – no separate user management.

    Power IMS fits if …

    You don't make medical devices and want an IMS in Teams.

    Greenlight Guru remains sensible if …

    You develop medical devices and need design controls.

    Vendor information summarised from publicly available sources as of 4 November 2026. No rating or testing of the third-party system; your edition and configuration may differ. Please let us know about any inaccuracies.

    What remains individual – and how we handle it

    We clarify these points in the replacement check before you decide.

    • Design controls

      No design controls for medical devices; assess individually.

    • Regulated industries & e-signatures

      No FDA 21 CFR Part 11 / EU GMP Annex 11 validation claimed – assess individually for GxP and medical-device requirements.

    Five steps from Greenlight Guru to Power IMS

    1. 1

      Replacement check

      Together we capture how you use Greenlight Guru today: modules, document types, workflows, integrations and obligations.

    2. 2

      Target picture & trial

      You test the matching Power IMS modules in Teams with your own examples before deciding.

    3. 3

      Setup

      Install the Teams apps and set up SharePoint storage, roles and approval workflows via the setup portal.

    4. 4

      Content & migration

      Transfer documents, processes and lists; clarify export options, histories and retention duties beforehand.

    5. 5

      Go-live & retire the old system

      Training, a parallel phase if needed, then cancelling Greenlight Guru in line with your contract term.

    Better fit: Power IMS or Greenlight Guru?

    Power IMS fits if …

    You don't make medical devices and want an IMS in Teams.

    Greenlight Guru fits if …

    You develop medical devices and need design controls.

    FAQ on replacing Greenlight Guru

    What happens to our content from Greenlight Guru?

    Documents and lists are transferred to your SharePoint. Which metadata, versions and histories can be exported depends on the old system and your contract and is clarified in the replacement check.

    Do we need to run both systems in parallel?

    Not necessarily. A short parallel phase can make sense until audits or approval cycles are completed.

    How long does the replacement take?

    Power IMS is ready to use as a standard Teams app. The duration depends mainly on the scope and quality of the content to transfer.

    Where is our data stored afterwards?

    In the SharePoint of your own Microsoft 365 tenant; permissions use your existing Microsoft 365 accounts.

    Replacement check for Greenlight Guru

    In a short meeting we review your usage and show the matching modules live in Teams.

    Greenlight Guru, Microsoft, Teams and SharePoint are trademarks of their owners, used for identification only; no affiliation with these vendors. Based on public vendor sources, without warranty; does not replace technical or legal review. Information inaccurate? Contact info@powermanufaktur.com and we will correct it promptly.

    More replacement pages