Microsoft 365 / SharePoint QMS with project-based configuration

    Replacing IOZ Process – with Power IMS in Microsoft Teams

    IOZ describes IOZ Process / QMS as a ready-to-use QMS foundation built from standard Microsoft 365 tools, integrated with SharePoint and Teams. Workshops and implementation configure processes, roles and document control. The product FAQ states no additional IOZ Process licence costs under the described existing Business/Enterprise licensing; optional extensions require separate assessment.

    11 comparison points

    11 of 11 points covered

    10 Power IMS module mappings1 Via Microsoft 3650 Assess individually

    11 editorial comparison points; not a measurement of complete feature parity. 1 vendor claims not yet verified in detail.

    Mapped Power IMS capabilities

    • Processes & process map

      Process map, turtle views and multi-standard process structure in Power QMS for Teams.

    • Document control & versioning

      Document control with status, metadata, versions and approval workflow in Teams; stored in your tenant's SharePoint.

    • Approval by process owner

      Configurable approval workflows with deputies and read receipts.

    • Roles & responsibilities

      Roles, RACI and process owners in Power QMS for Teams.

    • Consulting & rollout

      Standard Teams app with setup portal, ready to use; consulting via Power Manufaktur or partners.

    • Audits & actions

      Audit programme, checklists, findings and action tracking in Power Audit.

    • Risks & opportunities

      Risk register with assessment and actions in Power Risk; risks/opportunities per process in Power QMS.

    • Improvement & ideas

      Idea management and continuous improvement in Power CI.

    • Permissions, search & notifications

      Uses Entra ID, SharePoint permissions, Microsoft Search and Teams notifications – no separate user management.

    • Multi-stage approval & review reminders

      Configurable approvals, deputies and reminders in Power QMS; retention via Microsoft 365.

    • Languages & site filters

      Interface in 10 languages, translatable process names and master data, site/department filters and process permissions.

    Capability comparison: IOZ Process and Power IMS

    AreaIOZ Process (per vendor)Power IMS as replacement
    Processes & process map

    Process map in Teams, process pages and flowchart visualisations; multilingual option.

    Publicly documented; not hands-on tested

    Matching module

    Process map, turtle views and multi-standard process structure in Power QMS for Teams.

    Power QMSPower QMS for Teams
    Document control & versioning

    SharePoint DMS with document and process versioning, change tracking and Power Automate control including approval and archiving.

    Publicly documented; not hands-on tested

    Matching module

    Document control with status, metadata, versions and approval workflow in Teams; stored in your tenant's SharePoint.

    Power QMSPower QMS for Teams
    Approval by process owner

    Changed documents are automatically submitted to the process owner for approval.

    Publicly documented; not hands-on tested

    Matching module

    Configurable approval workflows with deputies and read receipts.

    Power QMSPower QMS for Teams
    Roles & responsibilities

    QM-relevant roles with responsibilities are captured in the project.

    Publicly documented; not hands-on tested

    Matching module

    Roles, RACI and process owners in Power QMS for Teams.

    Power QMSPower QMS for Teams
    Consulting & rollout

    Workshops, requirements and implementation; the FAQ describes about three months for small organisations and a year or more for large organisations.

    Publicly documented; not hands-on tested

    Matching module

    Standard Teams app with setup portal, ready to use; consulting via Power Manufaktur or partners.

    Scope / open: Files can be transferred; metadata, versions, approval history, permissions and retention need a test export. No universal migration connector is promised.

    Power QMSPower QMS for Teams
    Audits & actions

    A dedicated audit programme with checklists has not been verified in the reviewed public sources.

    Not yet verified in detail – no claim that features are absent

    Matching module

    Audit programme, checklists, findings and action tracking in Power Audit.

    Power AuditPower Audit
    Risks & opportunities

    IOZ documents a QMS extension with a SharePoint risk list, heatmap, probability, impact, actions, implementation status and review dates.

    Publicly documented; not hands-on tested

    Matching module

    Risk register with assessment and actions in Power Risk; risks/opportunities per process in Power QMS.

    Scope / open: Documented as a 2022 extension example, not as guaranteed IOZ Process baseline scope; confirm current availability, plugin and licensing.

    Power RiskPower Risk
    Improvement & ideas

    Documented SharePoint/Power Automate CI app with suggestion capture, assignment, assessment, actions, control dates and closure notifications.

    Publicly documented; not hands-on tested

    Matching module

    Idea management and continuous improvement in Power CI.

    Scope / open: Implementation/extension example; check current availability and inclusion in the specific offer.

    Power CIPower CI
    Permissions, search & notifications

    Uses standard Microsoft 365 features in the existing intranet.

    Publicly documented; not hands-on tested

    Via Microsoft 365

    Uses Entra ID, SharePoint permissions, Microsoft Search and Teams notifications – no separate user management.

    Multi-stage approval & review reminders

    The KE Elektronik implementation describes site-dependent two-stage approvals, archiving and review reminders.

    Publicly documented; not hands-on tested

    Matching module

    Configurable approvals, deputies and reminders in Power QMS; retention via Microsoft 365.

    Scope / open: Customer example, not a promise for every IOZ installation; assess approval stages and escalation specifically.

    Power QMSPower QMS for Teams
    Languages & site filters

    Multilingual process maps are offered; the KE Elektronik example shows multilingual content and site-specific filters.

    Publicly documented; not hands-on tested

    Matching module

    Interface in 10 languages, translatable process names and master data, site/department filters and process permissions.

    Scope / open: Site management does not establish central administration of independent Microsoft 365 tenants. Assess IOZ Visio/plugin licences per project.

    Power QMSPower QMS for Teams

    Power IMS fits if …

    You prefer guided app setup and a defined module portfolio; configuration, rollout and licences are compared specifically with IOZ's QMS foundation.

    IOZ Process remains sensible if …

    You want to combine IOZ's Microsoft 365 QMS foundation with an intranet, workshops and implementation-specific extensions.

    Vendor information summarised from publicly available sources as of 4 November 2026. No rating or testing of the third-party system; your edition and configuration may differ. Please let us know about any inaccuracies.

    Five steps from IOZ Process to Power IMS

    1. 1

      Replacement check

      Together we capture how you use IOZ Process today: modules, document types, workflows, integrations and obligations.

    2. 2

      Target picture & trial

      You test the matching Power IMS modules in Teams with your own examples before deciding.

    3. 3

      Setup

      Install the Teams apps and set up SharePoint storage, roles and approval workflows via the setup portal.

    4. 4

      Content & migration

      Transfer documents, processes and lists; clarify export options, histories and retention duties beforehand.

    5. 5

      Go-live & retire the old system

      Training, a parallel phase if needed, then cancelling IOZ Process in line with your contract term.

    Better fit: Power IMS or IOZ Process?

    Power IMS fits if …

    You prefer guided app setup and a defined module portfolio; configuration, rollout and licences are compared specifically with IOZ's QMS foundation.

    IOZ Process fits if …

    You want to combine IOZ's Microsoft 365 QMS foundation with an intranet, workshops and implementation-specific extensions.

    FAQ on replacing IOZ Process

    What happens to our content from IOZ Process?

    Documents and lists are transferred to your SharePoint. Which metadata, versions and histories can be exported depends on the old system and your contract and is clarified in the replacement check.

    Do we need to run both systems in parallel?

    Not necessarily. A short parallel phase can make sense until audits or approval cycles are completed.

    How long does the replacement take?

    Power IMS is ready to use as a standard Teams app. The duration depends mainly on the scope and quality of the content to transfer.

    Where is our data stored afterwards?

    In the SharePoint of your own Microsoft 365 tenant; permissions use your existing Microsoft 365 accounts.

    Replacement check for IOZ Process

    In a short meeting we review your usage and show the matching modules live in Teams.

    IOZ Process, Microsoft, Teams and SharePoint are trademarks of their owners, used for identification only; no affiliation with these vendors. Based on public vendor sources, without warranty; does not replace technical or legal review. Information inaccurate? Contact info@powermanufaktur.com and we will correct it promptly.

    More replacement pages