Installing and configuring Power QMS – how quickly your QMS is up and running in Microsoft Teams

    From the Setup Center to the base configuration: which steps installing Power QMS for Teams involves, what runs automatically and which decisions you should prepare.

    M365 in practice9 November 20268 min read

    In short

    The technical installation of Power QMS for Teams takes minutes: the Setup Center guides a Microsoft 365 administrator from sign-in to a verified environment. What takes time afterwards is not the technology but your decisions – who approves, how documents are numbered and what your process map looks like. This article shows every step in the right order.

    Power QMS for Teams – dashboard
    Power QMS for Teams – dashboard

    Preparation: three things before you start

    • Administrator role: Setup requires a Microsoft 365 work account with one of these roles: Global Administrator, SharePoint Administrator (for SharePoint permissions) or Teams Administrator (for distributing the Teams app). Regular users cannot complete the onboarding.
    • Create a SharePoint site: Create a communication site in advance, for example "PowerQMS". The Setup Center grants permissions but does not create the site itself.
    • Activate Document Sets: Power QMS needs the site collection feature "Document Sets" on that site (Site settings → Site collection features). Without it, no process files can be created.

    Power QMS for Teams does not require any additional Power Platform licences.

    Part 1: Installation in the Setup Center

    At setup.power-ims.com a wizard guides you through eight steps. Progress is saved – if you are interrupted, you continue where you left off.

    1. Grant administrator consent – connect SharePoint and Teams access with Microsoft 365.
    2. Tenant and administrator – the Setup Center shows tenant name, tenant ID and the detected directory roles, and reports whether the rights are sufficient.
    3. Review administrator consent – no client secrets are created in your tenant, no customer data is stored outside Microsoft 365, and access can be revoked at any time in Microsoft Entra ID.
    4. Select the SharePoint site – search for and select the prepared site. The wizard explicitly warns against using the tenant root URL.
    5. Grant permission – the Power IMS app gets full access to the selected site – and to this site only, not to your entire SharePoint.
    6. Distribute the Teams app – install for yourself, for specific people or for everyone.
    7. Validate the environment – automatic check of permission, Microsoft access, Teams app and SharePoint access.
    8. Installation complete – including a setup record as PDF for your documentation.

    The technical setup usually takes less than five minutes. The only exception: if Microsoft is still provisioning a newly uploaded app in the catalogue, distribution starts automatically as soon as it is ready – which can add a few minutes.

    Part 2: Onboarding inside the app

    When the app is opened for the first time, the onboarding under Settings guides you through the remaining steps. The status is checked continuously, and the app recognises steps that are already done.

    • Administrator approval and sign-in – one-time approval for the tenant and personal Microsoft sign-in.
    • Connect the SharePoint site and check site access – the app verifies that full access to the selected site from the Setup Center is in place.
    • Create lists and libraries – at the push of a button Power QMS creates document libraries, process files, drafts, tasks, read confirmations, users, notifications, master data, workflows and distribution groups. If the run is interrupted, it resumes next time.
    • Load starter data (optional) – standard master data and a QM process map with main and sub-processes, 40 sample documents (Word, Excel, PowerPoint, PDF) as drafts, and three examples each for the process designer, document designer and reports.
    • Choose the Office editing mode – edit documents in Office Online or in the desktop apps.

    Part 3: Base configuration – this is where you decide

    The technology is in place; now Power QMS becomes your QMS. Settings are grouped into five areas:

    Area
    Setup and app
    What you define
    Connection, app settings, dashboard tiles
    Area
    Organisation
    What you define
    Users, role model, deputies, master data
    Area
    Documents and processes
    What you define
    Process structure, workflows, number ranges, stamps, templates
    Area
    Communication
    What you define
    Distribution groups, languages, notifications
    Area
    Administration
    What you define
    Administration, licence

    A proven order: review master data and number ranges, create the role model, adopt or adjust the process map, define approval workflows, set up distribution groups. Roles such as "QM manager" or "process owner" can be entered instead of people as owner, reviewer or approver – when staff change, you only update the role, not every workflow.

    Part 4: Bring in what you already have

    If you are not starting from scratch, the import wizard transfers existing documents – including folder structure and assignment to processes and document types. Existing BPMN process models can be imported as well. For larger collections we also offer migration packages.

    What really takes time

    • Approval paths: Who reviews, who approves, who must read? Settle this in a short round with management before configuring.
    • Number ranges and document types: Nobody likes changing an established scheme. Keep your current logic if it works.
    • Process map: The starter data provides a template. Trimming is usually faster than drawing from scratch.
    • Demo data: Remove sample data before going live.

    Support

    Installation and base configuration are included in the licence fee. If you wish, we or one of our partners will guide you personally through the setup.

    Conclusion

    Installing Power QMS is no longer an IT project: a guided wizard, access to the selected site only, data in your own SharePoint. The real work is where it belongs – in your processes and responsibilities.

    Want to walk through the setup together? Book a meeting or discover Power QMS for Teams.

    Written by the Power Manufaktur team – specialists for quality management and Microsoft 365 based management systems.

    Ready for the next step?

    Book a free 30-minute consultation – we discuss your requirements and show what is possible with Power IMS.